Fri 17: Get In

Today we had the get in for Starlight (- take 2 after the bad weather caused the show to be postponed). As I helped after school, a lot of the work had been completed and there were only a few of us available.
My jobs included:
- taking down a leg and border in the hall (I acted as a weight supporter whilst Alanna spotted for Elishia)
- rigging two legs at the 'tunnel's entrance' (I rigged as Alanna and Elishia took the weight for each leg)
- running the lighting power and multicore cables (Corben and I ran these from the Box, around the wall of the tent, to backstage where the power was)
- attaching cables between Robe LEDs (I did this in the tower with Elishia)
- running HDMI cables from the TVs to the visuals desk (I worked in the tower with Corben, plugging the cables in and taping them along the truss. With Ryan's help we then cable-tied them across the roof supports to the visual desk.)